Soft Foundation Reinforcement for Mine Temporary Access Road (HDPE cellular confinement system)

2026-09-05
Latest company case about Soft Foundation Reinforcement for Mine Temporary Access Road (HDPE cellular confinement system)
Case Detail

Soft Foundation Reinforcement for Mine Temporary Access Road (HDPE cellular confinement system)

1. Project Overview: Access road to mining area. The subgrade consists of saturated clay. The pavement turns muddy and slurry-prone in rainy seasons, resulting in vehicle bogging. The original solution incurred an annual maintenance cost of up to 50,000 US dollars.

2. Selected Specification: HDPE geocell, height 100mm

3. Construction Scheme: Level the base course, directly lay HDPE geocell, fill with local crushed stone, and compact in layers.

4. Engineering Performance: Continuous monitoring across two rainy seasons shows pavement rutting <20 mm; annual maintenance cost reduced by 40,000 US dollars; payback period <12 months. Local material utilization greatly cuts the cost of hauled-in fill materials.